Products Overview Virtual Warehouse
Site Map Site Help

About Rite-Hite Industry Info. Contact Us FAQ



DOCK LEVELERS

TRUCK LEVELERS

VEHICLE RESTRAINTS

COMMUNICATIONS & CONTROL

SEALS & SHELTERS

INTERIOR DOORS

EXTERIOR DOORS

COLD STORAGE DOORS

BARRIER SAFETY SYSTEMS

HVLS INDUSTRIAL FANS

AFTERMARKET
  • Above Shelter Hoods
  • Loading Dock PMP
  • Rite-Lite HD-LED Dock Light
  • Bi-Parting Replacement Panels
  • Dok-Lok Vehicle Restraint Upgrade
  • Door PMP
  • Planned+Maintenance+Program
  • Planned+Maintenance+Programs
  • Dock Seal Repair
  • Warden Series Door Guards
  • GapSealr & Wedg-it Door Seals
  • Guardrite Protective Railing
  • Holddown Dock Leveler Upgrade
  • Rite-Seal Door Seal
  • Hydrachek Dock Leveler Upgrade
  • Light Communication Kits for the Loading Dock
  • Hydraulic Dock Leveler Conversion Kits
  • Loading Dock Lights
  • Dok-Saver
  • GX-4000 Universal Replacement Panel
  • Loading Dock Bumpers
  • Loading Dock Bumpers
  • Rite-Flex Sectional Door
  • Reflecto Guide Truck Guide Stripes
  • TS-2000 Trailer Stand
  • UV Reflecto-Guide Safety Strips
  • Safe-T-Lip Dock Leveler Upgrade
  • Coolman Dock Fan
  • Dok-Box Pit Forming Kt
  • Door Dok-Guardian
  • Planned Maintenance for Loading Dock Equipment




    Dock Leveler neglect is expensive -- and risky.

    If you neglect your levelers, you may have serious problems. They may start out small, but they will get worse. And, too many times they won't be reported - until a disaster takes place.

    Dock Leveler maintenance is a dirty job.
    Out back, far from production lines, dock levelers face rain, snow and dirt and take a constant pounding from trucks and forklifts. Without maintenance, levelers will break down. This means plant maintenance staff must make repairs and are pulled off jobs for which their skills are essential.

    Rite-Hite knows dock levelers.
    Let us care for your levelers under a Planned Maintenance Program (PMP). All you give up is a big headache. And look at what you gain:

    • More time to concentrate on priority jobs.
    • Safer, more productive docks.
    • Lower dock operation costs.

    With a Rite-Hite PMP program you get a 5-point inspection that includes:

    • Cleaning the dock leveler pit
    • Lubricating all hinges
    • Adjusting springs
    • Inspection of the entire unit
    • Maintenance of unit
    E-mail This Page





    Last Updated on 12/16/2008 12:36:48 PM

    HomeAbout Rite-HiteIndustry InformationContact UsFAQ/GloosarySearch
    How To BuyReference CenterFind A Rite-Hite RepVideo LibraryDock LevelersTruck Levelers
    Vehicle RestraintsSeals & SheltersIInterior DoorsExterior DoorsCold Storage DoorsParts & Accessories
    ...
    . © Copyright 2009 Rite-Hite Holding Corporation Site Map